Building the (Old) FLYLINE Great Lakes 2T-1A Kit (15)
Locking up the mounting of the upper wing on the cabane strut assembly established the angle of incidence (2 degrees positive). With that done, I’ll be able to build and fit the interplane (“N”) struts to match that angle. The first big decision is how I am going to attach the struts to both the […]